by Flow Optimizers | Mar 4, 2025
Fowler Water Reclamation Facility – Forsyth County, Georgia The Flow Optimizer Pump Suction Extension with Integrated Bellmouth enhances pump performance by optimizing fluid flow at the Fowler Water Reclamation Facility in Cumming, GA. Designed to prevent ragging and...

by Flow Optimizers | Feb 11, 2025
South Dakota Soybean Processors Airflow Conditioning Project – Volga, SD Buyer: South Dakota Soybean Processors, USAEngineer: DESMET, Marietta, GA Problem Turbulent airflow from the cyclone stacks was causing unreliable flow measurements and severe vibration, making...

by Flow Optimizers | Dec 29, 2024
Parkwood Area Lift Station Consolidation (PALSCo) Project in Durham, NC Buyer: Xylem Water Solutions, USAEngineer: Brown and Caldwell Project...

by Flow Optimizers | Dec 28, 2024
South Mesquite Creek Regional Wastewater Treatment Plant in Dallas, TX Client: North Texas Municipal Water DistrictConstruction: Archer Western ContractorsProject Engineer: Black & Veatch The Problem Surface Vortices: Excessive vortex activity in the wet well...

by Flow Optimizers | Dec 28, 2024
Spool AssembliesNichols & Trap Falls Pump StationCASE STUDY #8 Problem:Problems with Swirl and surface/sub-surface vortices prompted Sunshine Water Control District & Craig A. Smith Engineers to contract Clemson Engineering Hydraulics to build a Hydraulic...