
by Flow Optimizers | Mar 4, 2025
Fowler Water Reclamation Facility – Forsyth County, Georgia The Flow Optimizer Pump Suction Extension with Integrated Bellmouth enhances pump performance by optimizing fluid flow at the Fowler Water Reclamation Facility in Cumming, GA. Designed to prevent ragging and...

by Flow Optimizers | Feb 11, 2025
South Dakota Soybean Processors Airflow Conditioning Project – Volga, SD Buyer: South Dakota Soybean Processors, USAEngineer: DESMET, Marietta, GA Problem Turbulent airflow from the cyclone stacks was causing unreliable flow measurements and severe vibration, making...

by Flow Optimizers | Nov 25, 2024
Nansemond Treatment Plant in Suffolk, Virginia Project Summary: Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II Owner: Hampton Roads Sanitation District (HRSD)Buyer: Garney ConstructionProject Engineer: Tetra Tech, Inc. Project Overview The...

by Flow Optimizers | Aug 10, 2024
Chevron Pascagoula Refinery in Pascagoula, MS Construction: Hargrove Engineers & ConstructorsProject Engineer: Arcadis Project Overview Problem: Surface vortices & turbulence causing air entrainment resulting in reduced flows. Solution: Lowered point of...