Shipping this week – Hot Rush order with Approval drawings in 1 week and delivery in 3 weeks.
Customer: Rinconada Water Treatment Plant – Los Gatos, California purchased by Balfour-Beatty Construction
Problem: Pump sump was to close to back wall causing unstable flow conditions entering into the suction of the pump.
Solution: Four (4) Flow Optimizers Vortex Suppression Baskets size 18″ diameter x 6″ height x 30 vanes (12 degree vane spacing). Material in 316 stainless steel.